Color rose madder
Format organizer
Manufacturer handy forms
PackageHeight 7
PackageLength 210
PackageQuantity 1
PackageWeight 191
PackageWidth 149
PartNumber fa 5112
Size project planner
Brand Handy Forms
MPN FA5112
UPC 684758379894

Check the listing for details. A5 Size Project Planner, Sized and Punched for Rose Madder. Color: rose madder, Condition: New. Listed at 15.35 USD. PLANNER PAGE SIZES FOR 6-RING NOTEBOOKS CAN BE CONFUSING. This is a Project Planner for the popular A5 size notebooks. There is also a section for notes. Project planner and manager for A5 Size notebooks.

$10.75
$15.35