Brand Microsoft
Type Office Software Suites
Format Other
Language English, Multilingual
Minimum Hard Drive Space 4 GB
License Category Lifetime
Manufacturer Warranty Lifetime
Minimum RAM 4 GB
Minimum Processor Speed 1.6 GHz
For Operating Systems Windows
Number of Devices 1
Country of Origin United States

Check the listing for details. Microsoft Project Professional 2021. Condition: Brand New, Made in United States. Listed at 39.99 USD. This version includes multiple language options and a minimum of 4 GB of RAM and hard drive space for efficient performance.

$23.99
$39.99