Licence Category Standard
Brand Microsoft
Type Microsoft Project Standard 2010
Format DVD
Minimum Hard Drive Space 2 GB
Language English
License Category Standard
Minimum RAM 256 MB
Model X16-27544-02
MPN X16-27544-02
For Operating Systems Microsoft Windows Vista, Microsoft Windows XP, Windows
Number of Devices 1
Country of Origin United States

Check the listing for details. Microsoft Project Standard 2010 DVD Work Management Tool Windows Vista XP Sealed. Condition: Brand New, Made in United States. Listed at 87.35 USD. RAM: Minimum 256 MB. Can be installed and operated on one (1) device per product key (this product only includes one (1) product key). Factory sealed. Architecture: 32-bit or 64-bit capable.

$43.68
$87.35