Brand RECOIL
Type Butter Spreader
Color White
Material PP

Check the listing for details. Recoil WBS West Coast Butter Spreader with Length Adjustable Plunger. Color: White, Condition: New. Listed at 8.99 USD. Recoil WBS West Coast Butter Spreader with Length Adjustable Plunger, 1PC, Dishwasher Safe BPA-free Material with Cap for Fresh Storage, Fits East Butter for Corn Cobs, Bread, Waffles, Pan or Skillet.

$7.19
$8.99