| Brand | Scripto |
|---|---|
| Type | Mechanical Pencil Lead |
| Lead Diameter | .046 |
| Material | Lead |
| Country/Region of Manufacture | United States |
| Modified Item | No |
| Vintage | Yes |
Check the listing for details. Scripto Long Lead RED E520 12 Packs In Box 4” X .046” Full Box NOS. Condition: New. Listed at 49.99 USD. Scripto Long Lead RED E520 12 Packs In Box 4” X .046” Full Box NOS.