| Brand | WoodRiver |
|---|---|
| MPN | 24100-01 |
| UPC | 844788053601 |
Check the listing for details. WOODRIVER F-Style Clamp Rack. Condition: New. Listed at 31.98 USD. NEW, WOODRIVER F-Style Clamp Rack, 163115, F-Style Clamp Rack will hold up to 14 clamps securely, Each rack is approx. 24" long with mounting holes on 16" and 24" centers, Zinc plating keeps the metal rack looking new with little maintenance, Special profile on each end allows multiple clamp racks to be mounted end to end, This WoodRiver F-Style Clamp Rack is sure to make your shop neater, safer and more productive. This quality, heavy gauge steel WoodRiver® F-Style Clamp Rack has a zinc plating for long, maintenance-free lifetime of use. The holes are pre-drilled on 16" center, so it will mount in a finished or unfinished shop with ease. There are also mounting holes on 24" center and the ends have a profile that allows multiple clamp racks to be mounted end to end.